Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 40 results ...

Abdelhamid, T S (1999) Measuring and evaluating physiological demands of construction work, Unpublished PhD Thesis, , University of Michigan.

Al-Hussayen, M A (1980) Building problems in Saudi Arabia: The need for building research, and the development of building research approaches, Unpublished PhD Thesis, , University of Michigan.

Awwad, R E (2010) Neutral and risk-sensitive models for competitive bidding methods based on average and order statistics, Unpublished PhD Thesis, , University of Michigan.

Behzadan, A H (2008) Arviscope: Georeferenced visualization of dynamic construction processes in three-dimensional outdoor augmented reality, Unpublished PhD Thesis, , University of Michigan.

Chen, T Y-J (2019) Advancing quantitative risk analysis for critical water infrastructure, Unpublished PhD Thesis, , University of Michigan.

Choi, B (2018) The role of socio-cognitive process in construction workers' safety behaviors, Unpublished PhD Thesis, , University of Michigan.

Chung, K H Y (2022) Data fusion, hedonic pricing, and blockchains: Lowering investment barriers for sustainable infrastructure, Unpublished PhD Thesis, , University of Michigan.

Colberg, M R (1950) Federal control of construction following World War II, Unpublished PhD Thesis, , University of Michigan.

Dias, A, Jr. (1994) A managerial and financial study on the involvement of private sector companies in the development, construction, operation, and ownership of infrastructure projects, Unpublished PhD Thesis, , University of Michigan.

Dzeng, R-J (1995) CasePlan: a case-based planner and scheduler for construction using product modeling, Unpublished PhD Thesis, Department of Civil and Environmental Engineering, University of Michigan.

Han, S-H (2004) A working prototype of distributed collaborative architectural design system, Unpublished PhD Thesis, , University of Michigan.

Hasell, M J (1983) Gaming simulation: A communication tool for architects and designers, Unpublished PhD Thesis, , University of Michigan.

Henn, R L (2013) Moving targets: Managing interinstitutional relationships in green building design and construction, Unpublished PhD Thesis, , University of Michigan.

Howe, A S (1998) A new paradigm for life-cycle management of kit-of-parts building systems, Unpublished PhD Thesis, , University of Michigan.

Ismail, I A (2014) Financial cash flow determinants of company failure in the construction industry, Unpublished PhD Thesis, , University of Michigan.

Jebelli, H (2019) Wearable biosensors to understand construction workers' mental and physical stress, Unpublished PhD Thesis, , University of Michigan.

Kabo, F W (2006) Low-cost housing design and provision: A case study of Kenya, Unpublished PhD Thesis, , University of Michigan.

Kalampakorn, S (2000) Stages of construction workers' use of hearing protection, Unpublished PhD Thesis, , University of Michigan.

Khoury, H M (2009) Context-aware information access and retrieval for rapid on-site decision making in construction, inspection and maintenance of constructed facilities, Unpublished PhD Thesis, , University of Michigan.

Kirk, S J (1992) Improved design decision-making using small group value engineering gaming/simulation, Unpublished PhD Thesis, , University of Michigan.

Lee, H-S (1992) Automated interactive cost estimating system for reinforced concrete building structures, Unpublished PhD Thesis, , University of Michigan.

Leu, S-S (1992) Object-oriented representation model of construction technology information, Unpublished PhD Thesis, , University of Michigan.

Liang, C-J (2021) Affecting fundamental transformation in future construction work through replication of the master-apprentice learning model in human-robot worker teams, Unpublished PhD Thesis, , University of Michigan.

Liu, M (2019) Video-based human motion capture and force estimation for comprehensive on-site ergonomic risk assessment, Unpublished PhD Thesis, , University of Michigan.

Lundeen, K M (2019) Autonomous scene understanding, motion planning, and task execution for geometrically adaptive robotized construction work, Unpublished PhD Thesis, , University of Michigan.

Martin, S D (1981) Building contracts in classical Roman law, Unpublished PhD Thesis, , University of Michigan.

Mason, B (2023) Advancing autonomous green stormwater infrastructure, Unpublished PhD Thesis, , University of Michigan.

McIntosh, J F (1984) The application of the relational data model to computer-aided building design, Unpublished PhD Thesis, , University of Michigan.

Odeh, A M (1992) CIPROS: Knowledge-based construction integrated project and process planning simulation system, Unpublished PhD Thesis, , University of Michigan.

Paunikar, A (1983) Performance constraints of housing prefabricators in India: 3 case studies, Unpublished PhD Thesis, , University of Michigan.

Rohlman, R E (1978) Construction management: A comparison of management services, time, cost and supervision performance factors on public school projects in Michigan, Unpublished PhD Thesis, , University of Michigan.

Sherif, A H (1988) The choice of construction technology in developing countries: A socially conscious economic assessment approach, Unpublished PhD Thesis, , University of Michigan.

Srisuwanrat, C (2009) The sequence step algorithm: A simulation-based scheduling algorithm for repetitive projects with probabilistic activity durations, Unpublished PhD Thesis, , University of Michigan.

  • Type: Thesis
  • Keywords: construction activities; duration; critical path method; scheduling; scheduler; simulation
  • ISBN/ISSN:
  • URL: https://www.proquest.com/docview/304936772
  • Abstract:
    The construction industry and academia have realized the critical path method and other time-based methods were not suitable for repetitive projects, which were resource-driven in nature. Both communities have been attempting to develop a better technique to schedule repetitive projects. Many approaches have been proposed; however, they are capable of solving the problems only to a certain degree of complication. Most of these approaches were limited to deterministic problems. A few probabilistic scheduling methods using simulation techniques were proposed with improvement in capturing the stochastic nature of construction activities; however, none of them guaranteed continuous resource utilization. The Sequence Step Algorithm (SQS-AL) is a general scheduling algorithm for minimizing the duration of repetitive projects with probabilistic activity durations while achieving continuous resource utilization. SQS-AL consists of two main nested loops: the sequence step loop and the replication loop. For each sequence step, each replication loop is a simulation run that collects crew idle time for activities in that sequence step. The collected crew idle times are, then, used to determine resource arrival dates for user-specified confidence levels, i.e. , probabilities of having zero idle time in corresponding activities. The process of collecting the crew idle times and determining crew arrival times for activities on a considered sequence step is repeated from the first to the last sequence step. The effect of scheduling activities on the crew idle times for following activities is revealed step by step prior to scheduling the following activities. As a result, SQS-AL can guarantee continuous resource utilization for the user-specified confidence levels. This thesis also presents the application of work breaks, the determination of the controlling sequence, and the scheduling of resource-sharing activities in repetitive projects with probabilistic activity durations. An application, called “ChaStrobe,” was developed on top of the Stroboscope Graphical User Interface to facilitate schedulers in creating simulation model for repetitive projects and scheduling the projects using all concepts presented in the thesis. In addition, ChaStrobe consists of two search methods, the exhaustive search and the genetic algorithm. Using the proposed concepts, the programmability in Stroboscope, and the search methods, ChaStrobe can optimize the scheduling problems of repetitive projects effectively.

Stino, R M (1999) Effect of spatial variables on bricklaying productivity and ergonomics, Unpublished PhD Thesis, , University of Michigan.

Sugrue, D P (2021) Alternative financing for harbor infrastructure using big data analytics in the great lakes waterway, Unpublished PhD Thesis, , University of Michigan.

Taemthong, W (2002) Accounting for the impact of learning and scheduled overtime: Developing dynamic models to estimate and control labor time and labor cost, Unpublished PhD Thesis, , University of Michigan.

Tharachai, T (2004) Multiple project resource scheduling for construction, Unpublished PhD Thesis, , University of Michigan.

Thomas, A (2017) Modeling occupant behavior, systems life cycle performance, and energy consumption nexus in buildings using multi-method distributed simulation, Unpublished PhD Thesis, , University of Michigan.

Xiao, Y (2017) Three-dimensional reconstruction and modeling using low-precision vision sensors for automation and robotics applications in construction, Unpublished PhD Thesis, , University of Michigan.

Zouein, P P (1995) MoveSchedule: a planning tool for scheduling space use on construction sites, Unpublished PhD Thesis, Department of Civil and Environmental Engineering, University of Michigan.